Treadstone Associates
Article · 9 min read

Solar installers: site assessment to permit

Most trades on this hub deal with one inspecting authority. A residential solar installer deals with two, and they do not run on the same clock: the Electrical Safety Authority has to clear the electrical work itself, and the local utility has to approve the net-metering connection before the system can actually export power. A site assessment that gets the roof right but not the interconnection path still leaves a system that cannot legally be turned on.

Treadstone Associates · Updated 2026

Key takeaways

  • • Almost all electrical work in Ontario, solar included, requires filing a notification of work with the Electrical Safety Authority before starting — distinct from, and in addition to, any municipal building permit.
  • • Ontario's net metering programme is governed by O. Reg. 541/05, administered through the Ontario Energy Board, and lets a customer send excess self-generated electricity to the grid for a bill credit.
  • • Under section 8(8) of the Net Metering Regulation, unused credits carry forward for up to 12 months, after which they reduce to zero — and credits can only offset consumption charges, not other charges on the bill.
  • • Only a business holding a 7-digit ECRA/ESA Licensed Electrical Contractor number may legally perform electrical work for hire in Ontario; a qualified electrician working for an unlicensed company is not enough on its own.

Start with the fact that a solar installation clears two separate authorities before it can legally run, and they are not interchangeable. The first is electrical safety: the Electrical Safety Authority states that almost all electrical work requires filing a notification of work, often called a permit, with the Electrical Safety Authority, and that notification must be filed before starting the electrical work. That covers the array's wiring, the inverter and the interconnection at the panel — the physical safety of the installation. It says nothing about whether the system is allowed to send power back to the grid, which is a second, separate approval.

The second approval is the utility connection, not the panel

Sending excess self-generated power back to the grid for a bill credit runs through Ontario's net metering programme, a distinct regulatory track from the ESA notification. The Ontario Energy Board explains that net metering lets a customer generate renewable electricity for their own use while sending excess power to the grid for a credit toward future consumption, under O. Reg. 541/05. The mechanics of that credit are specific and easy to get wrong in a sales conversation: per section 8(8) of the regulation, credits can only be carried over to future bills for up to 12 months, after which they reduce to zero, and they can only offset the kWh consumption charge on the bill, not other charges. A homeowner told their system will "pay for itself in credits" without being told those credits expire after a year of non-use, or that they only ever touch one line of the bill, is being sold an incomplete picture of the economics — and it is the installer's sales process, not the ESA inspection, where that gap usually opens up.

The site assessment has to feed both approvals, not just the roof

A solar site assessment is often framed as a roofing and shading exercise — structural load, azimuth, tilt, obstruction shadows — and that part matters. But the assessment also has to capture what the ESA notification and the net-metering application both need: the existing service panel's capacity and whether it can accept the interconnection without an upgrade, and the property's local distribution company, since the net-metering application routes through whichever utility serves that address, not a single provincial portal. A design that is structurally sound on the roof but assumes a 100-amp panel can absorb a new interconnection it cannot, or that guesses at the local utility's process instead of confirming it, turns a straightforward install into a second site visit and a delayed connection date.

Worked example — net-metering credit that expires unused

A household's solar system produces a surplus of 900 kWh over the summer months, generating a bill credit at the utility's applicable rate.

The homeowner's winter consumption is lower than expected, and by the following August — 12 months after the credit accrued — only 640 kWh of that credit has been drawn down against consumption charges.

Under section 8(8), the remaining 260 kWh of credit reduces to $0 at the 12-month mark. It cannot be extended, and it cannot be applied to any other line on the bill.

An installer who explains the 12-month clock at the sales stage, rather than after the fact, sets a homeowner's expectations correctly; one who does not is the reason for the angry call the following September.

Where AI actually helps

Three uses hold up against that shape. First, a site assessment checklist that captures panel capacity and the serving local distribution company alongside the roof and shading data, so the ESA notification and the net-metering application are not blocked by a gap discovered after the roof work is already quoted. Second, tracking the ESA notification and the utility's net-metering approval as two separate milestones with two separate clocks, rather than one "permit" status that hides which authority is actually holding up the connection date. Third, drafting the homeowner-facing explanation of the 12-month credit rollover from the OEB's own wording, so the sales conversation states the real mechanics rather than an optimistic paraphrase — a person still signs off on what gets sent to the customer.

Only a licensed contractor can do the electrical work at all

One more gate sits underneath both approvals above: who is allowed to touch the wiring. The ESA is explicit that Licensed Electrical Contractors are the only businesses in Ontario legally authorized to do electrical work in a home, and they carry a 7-digit ECRA/ESA licence number that proves it — a qualified electrician or Master Electrician is not permitted to perform the work for hire on their own. A solar company that subcontracts its electrical connection needs to confirm the sub holds that business-level licence, not just that the individual doing the work is a qualified electrician; the two are not the same credential.

A same-day roof quote is only half the pipeline

The roof-facing part of a solar sale — azimuth, tilt, shading, panel count — is the part most easily automated from a satellite image or a site photo, and it is also the part that least determines how long the customer actually waits to flip the system on. The ESA notification and the utility's net-metering approval both run on their own processing timelines that a same-day roof quote cannot shorten. Setting the customer's expectation for the connection date around the slower of those two approvals, rather than the design step that finishes first, is the difference between a solar company whose quoted timeline holds and one whose customers call every week asking why the panels are up but the system still is not exporting power.

Related reading: how utility contractors manage locate requests and buried-infrastructure records and what a Red Seal endorsement actually confirms about a trade credential.

Common questions

Does a solar installer need a separate ESA notification from the building permit?

Yes. The Electrical Safety Authority requires almost all electrical work, including solar installations, to be notified before starting, which is a distinct requirement from any municipal building permit for the physical mounting or structural work.

How long do net-metering credits last in Ontario?

Under section 8(8) of O. Reg. 541/05, unused credits carry forward for up to 12 months, after which they reduce to zero. They can only offset consumption charges on the bill, not other charges.

Can any electrician install a residential solar system in Ontario?

The individual doing the wiring must be a qualified electrician, but the business performing the work for hire must also hold a 7-digit ECRA/ESA Licensed Electrical Contractor number. A qualified electrician working for an unlicensed company does not satisfy the requirement on its own.

Can AI approve a net-metering application or an ESA notification?

No. It can assemble the site data both applications require and track their status as separate milestones. The utility and the Electrical Safety Authority make the actual approval decisions.

See where AI pays off first in your business.

A 30-minute call is enough to tell you whether AI pays for itself here.