Can we refuse a substituted product?

Yes, and in most cases you're not just allowed to refuse an unapproved substitute, you're supposed to.

Treadstone Associates · Updated 2026

Short answer

Yes. The specified product is what the contract requires until a substitution has been formally approved through the right channel — not once a supplier insists it’s “equal.” An unapproved swap is something you can, and generally should, refuse until it has actually been reviewed and accepted by whoever holds authority to accept it.

The channel depends on when the request comes

Before a bid closes, a proposed alternate is a bidder inquiry, and all bidders are entitled to equal access to information during a procurement process — a procuring authority cannot selectively withhold information from some bidders. CCDC’s own bidding guide reflects this: CCDC 23 groups bidder inquiries and the issuance of addenda together for a reason. A private “sure” from one consultant to one bidder, never formalized, binds nobody and protects nobody. After award, the same question routes through a different process on purpose: a submittal — “the written and/or physical information provided by a responsible contractor… submitted to the design team for approval of equipment, materials, etc. before they are fabricated and delivered to the project” — a documented review, not an email to the site superintendent.

Who actually has authority to accept one

CCDC 2 frames reviewing that submission as part of “the role and authority of the consultant” in administering the work — not the site superintendent, not the project coordinator fielding the question in the field. An acceptance from someone without that authority doesn’t bind the project, even if the request seemed entirely reasonable at the time. See alternates and substitution requests for the full picture of how a pre-bid alternate and a post-award substitution differ in practice.

The record has to show a decision, not a conversation

Whatever the answer, it needs to leave a dated record. Bluebeam’s own interactive Submittal Status stamp ships with exactly three outcomes — “Approved,” “Revise” and “Rejected” — because interactive stamps are created with JavaScript so a reviewer enters project information and picks a status rather than just placing a static image, and the reviewer’s decision needs to be traceable the same way a paper stamp always was. A verbal yes in the field is not a substitution that’s been accepted under the contract.

What refusing actually protects

If you wave through an unapproved substitute and it turns out not to be equivalent, that gap can end up sitting with you, not with the supplier who offered it or the consultant who never saw it. Refusing until it has been properly reviewed keeps that risk where the contract actually puts it. A rejected request usually only costs whoever proposed it some review time, unless the contract specifically allocates re-review costs — but a submittal that clearly demonstrates equivalent performance, not just an equivalent price, tends to move through review faster than one that leaves the reviewer to work that out.