Ontario doesn’t publish one fixed number — a permit stays open until inspections are done and the file is closed, and a stalled project risks the municipality revoking it.
Short answer
There isn’t a single province-wide answer, and that’s worth knowing on its own. A building permit in Ontario stays “open” until every required inspection has been completed and the file is formally closed by the municipality, which can take anywhere from weeks to years depending on the project and how quickly inspections get booked — and municipalities do have authority to revoke a permit that never starts or stalls indefinitely.
It helps to separate two different clocks that people often confuse. The province’s citizens’ guide sets out how fast you get the permit — “the timeframe on a permit application for a house is 10 days” for a complete application — and how fast an inspection happens once requested, with “the municipal building official… required to carry out the inspection within two working days of being notified.” Neither of those numbers says anything about how long the permit itself stays valid once it’s issued; they govern the front end of the process, not its lifespan.
In practice, a permit’s status is described as open or closed rather than expiring on a fixed date. treadstonelaw.ca explains that “a permit is ‘open’ whenever it hasn’t reached that final closure step — whether because an inspection was never booked, the paperwork was never followed up on, or the project was left partly finished,” and how long that takes “depends entirely on the municipality, the scope of the original work, and whether any deficiencies turn up at inspection.” The practical consequence is blunt: “the same open permit will keep resurfacing on searches until someone actually closes it out” — a real problem for anyone who later tries to sell.
What is well-established, even without a single quotable figure, is that a chief building official has authority under the Building Code Act to revoke a permit where construction hasn’t started or has been left inactive for an extended period. The specific trigger windows for that are set and administered at the municipal level, and this piece isn’t going to hand you a number pulled from a different city or a previous job — ask your own building department what their local policy is before you assume a stalled permit is still safely sitting there.
Owners tend to assume either that a permit lasts exactly one year or that it lasts forever once issued — neither is a safe default. Treat “open” as “still your responsibility to close,” and treat a long gap in activity as a real risk to the permit’s status, not a technicality you can fix later. See also whether you need a permit in the first place and what happens if you build without one for the two questions this one connects to most.