A contractor showing up without current coverage isn’t a paperwork gap you can wave off — the liability has a habit of finding the person who hired them.
Short answer
It depends on the province, and the difference is significant. In Ontario, a WSIB clearance is valid for up to 90 days across all of a contractor’s contracts, so checking it is fast — but if it’s lapsed and you hire the contractor anyway, you can be held liable for their workplace injury costs. In BC, WorkSafeBC’s clearance letter shifts liability for the entire contract period, which makes a one-time check at the start of a long project far less protective than it looks.
WSIB makes this close to a non-excuse: “this clearance number is valid for all your contracts and is valid for up to 90 days”, and a request that isn’t already on file arrives “within three to five business days.” Only “registered businesses in good standing can obtain a clearance”, which is exactly why a lapsed one is a real signal, not a clerical delay — a business behind on premiums or reporting won’t have one to show you.
WorkSafeBC’s clearance letter is the province’s equivalent, but the mechanics differ in a way that matters for how often you check: BC’s exposure runs for the entire contract period rather than resetting each time you pull a fresh letter, so a clearance checked at kickoff on a six-month project doesn’t tell you anything about month five. Ontario’s 90-day validity window is closer to a standing check; BC’s is closer to a one-time gate you need a reason to revisit.
One more wrinkle worth knowing before you assume every vendor needs to clear this bar: independent operators outside construction might not be obligated to register with the WSIB, and therefore would not be eligible for a clearance certificate at all. That’s a narrow exception, not a loophole for a general contractor, and it’s worth confirming with WSIB directly rather than a vendor’s own say-so if someone tells you they’re exempt.
Make the clearance check part of onboarding a vendor, not a one-off favour you do the first time: confirm it before the first invoice, and again if the service contract runs past the window your province’s clearance actually covers. If a vendor’s coverage has genuinely lapsed, don’t let them start the work while you sort it out — the cost of a short delay is smaller than the cost of the claim you’d be inheriting.
A 30-minute call is enough to tell you whether your vendor onboarding actually catches this.