A reserve fund study is the condo corporation's forward funding plan for big-ticket repairs — roof, elevators, garage membrane — and Ontario runs three classes of it: a full class 1 study first, then class 3 and class 2 studies alternating at least every three years after that.
The Condominium Authority of Ontario states the sequence directly: "A condo corporation must complete a class 1 study within the first year following the registration of the declaration and description. After the first class 1 study is done, the class 3 and class 2 studies are done on an alternating basis at least every three years". The financial analysis inside each study "must include ... a recommended funding plan projected over a period of at least 30 consecutive years", citing s. 32 of O. Reg. 48/01 and ss. 94(8) and 37(1) of the Condominium Act, 1998.
A completed study starts two clocks for the board. First, "condo boards must review the reserve fund study within 120 days of receiving it and propose a plan for future adequate funding". Second, once it has proposed a plan, "boards must send owners a notice of future funding within 15 days of proposing a plan", which must include a summary of the study, a summary of the proposed plan, and where the plan departs from the study's own numbers — using "a specific form that the condo corporation is required to use under the Condo Act".
The study's findings and any funding shortfall then have to show up in the corporation's disclosure to buyers — see the status certificate package.
A 25-year-old Ottawa high-rise's class 1 reserve fund study lands showing the fund is short for an elevator modernization due in six years. The board has 120 days from receiving the study to build a funding plan, then 15 days from proposing that plan to send owners the CAO-prescribed notice of future funding, summarizing the study, the plan, and exactly where the plan departs from the study's own numbers. Skipping that notice isn't a paperwork lapse; it's the step the Act requires before the board can raise fees or levy a special assessment to close the gap.