Submetering looks like a straightforward cost-recovery decision until the regulatory side shows up: in Ontario, billing tenants individually for electricity means operating under a licensed regime built specifically to stop that arrangement from being used against them.
Key takeaways
A submetering decision usually starts as a straightforward question: does billing tenants for their actual electricity use recover more cost than a flat allocation formula would? In Ontario, that question can't be answered without also answering a second one — is the building willing to operate under, or contract with, a licensed Unit Sub-Meter Provider, because submetering here isn't just a billing method, it's a regulated activity with its own consumer-protection code built specifically around it.
Ontario's Ontario Energy Board states its role directly: “the OEB licenses USMPs, and establishes and enforces rules and laws that protect customers.” The governing statute is the Energy Consumer Protection Act, 2010 (ECPA), with operational requirements set out in the Unit Sub-Metering (USM) Code. That framework exists because submetering puts a private landlord or building owner in the position of a utility to the tenant — billing for a commodity the tenant has no choice about consuming from that specific provider — and the OEB's licensing regime is the mechanism that stops that position from being used to overcharge or under-protect the person paying the bill.
The core financial rule is simple to state and easy to get wrong operationally: a USMP must pass through electricity and delivery costs “with no mark-up.” The revenue a submetering arrangement generates for a provider comes from permitted fees instead — the OEB names account setup, disconnection/reconnection, and meter disputes specifically as chargeable events. A building owner modelling the business case for submetering needs to model it on that fee structure, not on any margin over the commodity cost, because there isn't one available under this framework.
Two consumer protections that apply to a regular utility customer don't carry over automatically to a submetered tenant, and both are worth knowing before a building converts. Submetered customers “cannot switch between electricity price plans” the way a directly billed utility customer can. And the OEB is explicit that its own “winter disconnection ban does not apply to multi-unit buildings serviced by USMPs” — a meaningful gap from what tenants in a bulk-metered building, billed by the local utility directly, would otherwise be protected by.
Worked example: comparing the two billing models
A 120-unit residential building currently bulk-meters electricity and recovers the cost through a flat allocation baked into rent or common charges. Actual per-unit consumption varies significantly — some units run well above the average, some well below — so the flat allocation is systematically subsidizing the heaviest users at the expense of the lightest.
Converting to submetering under a licensed USMP fixes that misallocation, but it isn't a free change: the building now needs a licensed provider (in-house or contracted) operating under the USM Code, billing at cost with no mark-up, generating its revenue only from the specific permitted fees, and accepting that submetered tenants lose price-plan choice and the winter disconnection protection that bulk metering would have preserved for them. The business case has to weigh the fairer cost allocation against the compliance overhead and the reduced consumer protections that come with the switch — it isn't simply “bill actual usage instead of an average.”
Outside the two specific gaps above, the OEB describes USMP customer service rules as “generally similar to those of electricity utilities” — covering “bill issuance, payments, security deposits, arrears agreements, and disconnection procedures.” That's a meaningful reassurance for a building weighing the switch: submetering isn't an unregulated billing free-for-all outside the two carved-out exceptions, it's a licensed activity built on rules that largely mirror what a conventional utility customer already experiences, with the price-plan and winter-disconnection differences being the specific, named exceptions rather than the general rule.
Because submetering is licensed, it's also measured: the OEB “publishes annual complaint data by USMP, categorizing complaints and calculating complaints per 1,000 customers.” That's a real, comparable, public performance record — a building owner evaluating which USMP to contract with (rather than licensing the building itself) can check that record directly instead of relying entirely on a vendor's own pitch. A submetering decision made without checking it is skipping the one piece of independent evidence the regulator itself makes available for free.
Whichever model a building chooses, the resulting data is what makes other energy decisions verifiable at all — a demand-response commitment can't be substantiated without granular usage data, and neither can a commissioning file's claimed savings. See how metering data supports a demand-response strategy, and how a commissioning process uses the same underlying measurement to verify that savings actually happened.
No. The OEB requires a Unit Sub-Meter Provider to pass through electricity and delivery costs with no mark-up. Revenue comes only from specific permitted fees — account setup, disconnection/reconnection, and meter disputes — not a margin on the commodity.
Not identically. Submetered customers cannot switch between electricity price plans, and the OEB's winter disconnection ban does not apply to multi-unit buildings serviced by a USMP — both are protections a bulk-metered, directly billed customer would otherwise have.
The OEB publishes annual USMP complaint data, including complaints per 1,000 customers, categorized by type. That public record is available to check directly rather than relying solely on a provider's own sales material.
The Energy Consumer Protection Act, 2010, with the operational specifics set out in the Unit Sub-Metering (USM) Code, both enforced by the Ontario Energy Board, which also licenses every USMP operating in the province.